Pool Redev

Options for pool redevelopment

Show Sidebar

Options for pool redevelopment

The 3 options for the Olympic Pool redevelopment. Tell us your preferred option on the survey below. 

The Olympic Pool redevelopment project, if grant funded, will implement the best options for providing the community with aquatic and recreational experiences for the next 30 years. 

Option 1 - 25m Lap pool + warm water pool

Option 1 Artist

 

1. New 25m x 21m Pool 1.4m - 2m deep. Heated to 27-28° °C
Pool uses: • 8 lanes casual/ development swimming • deep water aqua programmes • leisure Inflatables • ramp entry
2. New warm water pool 15m x 10m heated to 32-33°C
dedicated indoor change rooms for sensitive users and classes with direct access to warm pool. Pool uses: • Learn to Swim pool • hydrotherapy • warm water aqua programs • leisure • ramp entry
3. New administration & change rooms for all 3 options
Reception and lobby • new change rooms to cater for families, accessible, male and female needs with direct access to main pool • new additional separate outdoor male and female change for outdoor pools. Summer only use.
Estimated project costs: Indoor only: $13.5m - $14.5m

 

Option 1

 

Option 2 - 25m Lap pool + warm water pool + leisure pool + lazy river + spa + toddlers pool

Option 2 Artist

 

1. New 25m x 17.m Pool 1.4m - 2m deep. Heated to 27-28° °C
Pool uses: • 7 Lanes casual/ development swimming • deep water aqua programmes •  leisure inflatables • ramp entry

2. New leisure pool
• Lazy river & Leisure pool 30-31 °C • Toddlers pool 32 °C • Spa pool 38 - 40 °C
3. New separate warm water pool 12.5m x 8m. Heated to 32-33°C
Pool uses: • Learn to Swim pool • Hydrotherapy  • warm water aqua programs  • dedicated indoor change rooms for sensitive users and classes with direct access to warm pool • ramp entry
4. New Administration and change rooms, details as per Option 1
Estimated project costs: Indoor only: $17.5-18.5M

Option 2

 

Option 3 - 50m Multi-use pool + warm water pool and zone + spa

Option 3 Artist

 

1. New 50m x 21m multi-use pool with movable bulkhead to allow warmer water zone for leisure activities 1.4m - 2m deep.
Pool uses: • Half of pool heated to 27-28°C  • min 7 lanes casual/ development swimming • water sports • under water hockey • water polo • canoe polo • surf life saving • half of pool heated to 29-30°C • deep and shallow water aqua programmes •leisure/Inflatables • ramp entry special Events 50m format: • competition swimming • under water hockey • water polo • canoe polo • surf life saving
2. New spa pool 38 - 40°C 
3. New separate warm-water pool 12.5m x 8m 32-33°C 
Pool Uses: • Learn to Swim pool • hydrotherapy • leisure/recreation • warm water aqua programs • dedicated indoor change rooms for sensitive users and classes with direct access to warm pool • ramp entry
4. New administration and change rooms, details as per Option 1
Estimated project costs: Indoor Only: $20m - $21M

 

Option 3

 

Phase 2 - Outdoor area 

New wet deck • zero depth wet deck water play area with bubbles and spouts and water toys for toddlers • wet deck area 200m²
New leisure pool in place of old 33m pool • new lazy river • new leisure pool • new toddlers pool • approx. 550m2
Existing dive pool retained as it is 2 new hydroslides • new 12m access tower • 1 speed slide with exit shute • 1 bowl with exit shute
Upgraded and new filtration and heating plant to achieve full compliance.
New landscaped outdoor area to enhance accessibility and aesthetic. Enhance connection to Centennial Marine Drive.
Estimated Project Costs: Outdoor Only: $5.5m - $6m

Option 1 Phase 2

 

Tell us your preferred option

If you have trouble viewing the survey, here's the link

Create your survey with SurveyMonkey
Last updated: