Contact UsWe will provide information about road closures and restrictions during emergency conditions such as flooding.
For information about state highways, please visit the AA Roadwatch website or Transit NZ website.
Council maintains all the local roads in our district. If you would like to report a problem with our roads, please contact us.
10 February 2010 - roadworks in our district.
Ford crossings that were blocked during anniversay weekend's rain event have not been cleared yet. Care is required. Ford crossings will be cleared as machinery becomes available.
| Road | Conditions | Expected Completion Date |
| Armstrong Road (Waipaoa Bridge) | Waipaoa Bridge - restricted to 5T weight - light traffic only | Currently working at site |
| Bruce Road | Open - caution required | Currently working at site |
| Bushyknoll Road | Open - Marginal | Currently working at site |
| Childers Road - Stanley to Collins | Road sealing & AC surfacing, construction traffic, sealing etc | 13 February 2010 |
| Gaddums Hill (0.5km to 1.6km | Road strengthening. Construction traffic, workmen on site. | 13 February 2010 |
| Gladstone Road (Disraeli to Roebuck) | Construction traffic, workmen on site. | 13 February 2010 |
| Harper Road, Back Ormond Road | Road strengthening, construction traffic, workmen on site | 13 February 2010 |
| Lottin Point Road RP1.4-2.8km) | Road strengthening, loose metal, construction traffic, workmen on site | 13 February 2010 |
| Mata Road | Closed to all traffic at RP 16.0km for 7 days from 10 Feb. | 17/02/2010 |
| Panikau Road | Road strengthening and sealing - loose metal, construction traffic, sealing etc | 30 January 2010 |
| Pehiri Road | Open - silt and debris near Veitch Road | Currently working at site |
| Pehiri Road | Open - some debris | Currently working at site |
| Smith Road | Road sealing - loose metal, construction traffic etc | 13 February 2010 |
| Tauwhareparae Road | Doonholm Slip - caution required | Currently working at site |
| Tauwhareparae Road | Road strengthening and sealing - loose metal, construction traffic etc | 13 February 2010 |
| upper Tauwhareparae Road | Mangamanu Bridge - caution required due to tree debris against bridge | Currently working at site |
| Te Kowhai Road | Mangatai Access Bridge - caution required due to tree debris damage | Currently working at stie |
| Waikura Valley Road RP6.3 - 7.3km | Seal extension - loose metal, construction traffic, sealing etc | 13 February 2010 |
| Wharekopae Road | Culvert 179 - Road surface defects, caution | Currently working at site |