<?xml version="1.0"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom">
	<channel>
		<title>12 Mar 10, 02:56 Update on Road conditions</title>
		<link>http://www.gdc.govt.nz/road-conditions/</link>
		<atom:link href="http://www.gdc.govt.nz/road-conditions/" rel="self" type="application/rss+xml" />
		<description></description>

		
		<item>
			<title>Road conditions</title>
			<link>http://www.gdc.govt.nz/road-conditions/</link>
			<description>&lt;p&gt;We will provide information about road closures and restrictions during emergency conditions such as flooding.&lt;/p&gt;
&lt;p&gt;For information about state highways, please visit the &lt;a title=&quot;www.aa.co.nz&quot; href=&quot;http://maps.aa.co.nz/traffic/roadwatch&quot; target=&quot;_blank&quot;&gt;AA Roadwatch website&lt;/a&gt; or &lt;a title=&quot;www.transit.govt.nz&quot; href=&quot;http://www.transit.govt.nz/road/highwayinfo-north.jsp&quot; target=&quot;_blank&quot;&gt;Transit NZ website&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Council maintains all the local roads in our district.  If you would like to report a problem with our roads, &lt;a title=&quot;Roads and footpaths&quot; href=&quot;http://www.gdc.govt.nz/roads-footpaths/&quot;&gt;please contact us&lt;/a&gt;.&lt;/p&gt;
&lt;h2&gt;Road works &lt;/h2&gt;
&lt;p&gt;Last updated&lt;strong&gt; - 12 March 2010 &lt;br/&gt;&lt;/strong&gt;&lt;/p&gt;
&lt;table style=&quot;width: 100%; height: 48px;&quot; border=&quot;0&quot; align=&quot;left&quot;&gt;&lt;tbody&gt;&lt;tr style=&quot;background-color: #e4e3e3;&quot;&gt;&lt;td style=&quot;width: 180px;&quot;&gt;&lt;strong&gt;Road &lt;/strong&gt;&lt;/td&gt;
&lt;td style=&quot;width: 180px;&quot;&gt;&lt;strong&gt;Conditions&lt;/strong&gt;&lt;/td&gt;
&lt;td style=&quot;width: 180px;&quot;&gt;Expected Completion Date&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Armstrong Road&lt;/strong&gt; (Waipaoa Bridge)&lt;/td&gt;
&lt;td&gt;Waipaoa Bridge - &lt;strong&gt;restricted to 5T weight &lt;/strong&gt;- light traffic only&lt;/td&gt;
&lt;td&gt;Currently being analysed&lt;br/&gt;&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Bushyknoll Road&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Open - caution required&lt;/td&gt;
&lt;td&gt;Work in progress&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Cobden Street&lt;/strong&gt; (Childers-Kahutia)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;20 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Cross Road (Waiomatatini Rd - end of seal)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Derby Street&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;13 March 2010&lt;/td&gt;
&lt;td&gt;13 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Gladstone Road&lt;/strong&gt; (Disraeli to Roebuck)&lt;/td&gt;
&lt;td&gt;Construction traffic, workmen on site.&lt;/td&gt;
&lt;td&gt;6 April 2010&lt;br/&gt;&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Lottin Point Road&lt;/strong&gt; RP1.4-2.8km)&lt;/td&gt;
&lt;td&gt;Road strengthening, loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;20 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Moanui Road&lt;/td&gt;
&lt;td&gt;Bridge Approaches - loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Noel Bull Avenue&lt;/strong&gt; (Mill Rd-End)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;20 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Ormond Road&lt;/strong&gt; (Ruru Ave-City Boundary)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;20 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Paroa Road (RP 3.6km - Rp6.2km)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;20 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;TahoraRoad&lt;/td&gt;
&lt;td&gt;Bridge Approaches - loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Tauwhareparae Road&lt;/strong&gt; (Racecourse - Mangaheia Rds)&lt;br/&gt;&lt;/td&gt;
&lt;td&gt;Re-surfacing- loose metal, construction traffic etc&lt;/td&gt;
&lt;td&gt;20 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Thatcher Road (SH35- End)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Te Wera Road&lt;/td&gt;
&lt;td&gt;Bridge Approaches - loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Puhanga Road (SH35 - End)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Te Kowhai Road&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Mangatai Access Bridge - &lt;strong&gt;restricted to 5T weight&lt;/strong&gt; - light traffic only&lt;/td&gt;
&lt;td&gt;Currently being analysed&lt;br/&gt;&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Walker Road (waiomatatini Rd Intsn)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Waimata Valley Road&lt;/strong&gt; (Utting-End of seal)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;20 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Waiomatatini Road (Cross Road - Walker Road)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Waiomatatini Road (RP8.1km - RP9.5km)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Waiau Road (RP2.1km - RP2.5km)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;20 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Waitangi Street&lt;/strong&gt; (Derby-Cobden)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;20 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Whakarau Road&lt;/td&gt;
&lt;td&gt;Bridge Approaches - loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;Wharekopae Road (Seal joint RP 44.1 - Pembroke Road)&lt;/td&gt;
&lt;td&gt;Re-surfacing -loose metal, construction traffic, workmen on site&lt;/td&gt;
&lt;td&gt;27 March 2010&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Wharekopae Road&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Culvert 179 - Road surface defects, caution&lt;/td&gt;
&lt;td&gt;Work in progress&lt;br/&gt;&lt;/td&gt;
&lt;/tr&gt;&lt;tr&gt;&lt;td&gt;&lt;strong&gt;Wharekopae Road&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Culvert 162 - Road shoulder defects&lt;/td&gt;
&lt;td&gt;Work in progress&lt;/td&gt;
&lt;/tr&gt;&lt;/tbody&gt;&lt;/table&gt;</description>
			<pubDate>Tue, 31 Mar 2009 16:14:56 +1300</pubDate>
			
			<guid>http://www.gdc.govt.nz/road-conditions/</guid>
		</item>
		

	</channel>
</rss>